As a national mid-range guide: £36,000 to £50,400 for a typical 12 m2 project, including 20% VAT. Budget finishes start around £30,600, premium runs to £70,600, and London adds a quarter. Set your own size, finish and region below for an instant estimate, no email required.

Side return extension, mid-range, Midlands
£36,000 to £50,400
Including 20% VAT. An indication, not a quote: prices vary per trade and property.
Take it further
Prices include 20% VAT. New builds and some energy-saving works can qualify for 0% or reduced VAT; ask your installer.
Got quotes in already? Check if they are fair. Want to know when the money leaves? See the phase-by-phase plan.
Extensions and loft conversions often fall under permitted development. Check before you budget.
All figures come from the same validated 2026 price data as the calculator above (sources: Checkatrade, MyJobQuote and comparable national 2026 cost guides, checked August 2026; see how we price), so this page and your estimate can never disagree. Planning this in London? See the London guide, or compare every region in the regional overview. Planning an extension or loft? Check permitted development first.
You are buying a small number of square metres with all the fixed costs of a full extension: foundations, steels, roof, glazing and drain moves in a tight strip with awkward access. The value is in what it does to the whole ground floor, not in the metres themselves.
Yes, all ranges include 20% VAT. New builds and some energy-saving works can qualify for 0% or reduced VAT; ask your installer whether your project applies.
A lot: London typically runs 20 to 35 percent above the national average (this site plans with +25%, the quarter mentioned above), and the North of England, Scotland and Northern Ireland sit 10 to 20 percent below. The calculator adjusts for your region automatically, and the regional overview shows every factor.
It is a guide range from national 2026 cost guides, adjusted for finish level and region. Real quotes vary per trade, property and specification; treat it as a starting point, budget 10 to 15 percent contingency, and always get at least three itemised quotes.