RenovationStart

What does a kitchen renovation cost in London?

In London: £12,500 to £22,500 at mid-range, including 20% VAT, against £10,000 to £18,000 nationally. Budget starts around £7,500, premium runs to £45,000. Set your finish level and region below, no email required.

Kitchen renovation in progress

What the sources say

Checkatrade, Kitchen Renovation: Cost Breakdown: £6,200 to £16,800

full budget kitchen renovation; mid-range £11,500-35,000, bespoke £15,000-50,000+. The guide does not state its VAT treatment. Guide dated 2025-04, opened and checked 2026-08-26.

MyJobQuote, Kitchen Fitting Cost Guide: £6,000 to £20,000

full new kitchen, supply and installation; bespoke and luxury kitchens exceed £50,000. The guide does not state its VAT treatment. Guide dated 2026-08, opened and checked 2026-08-26.

The national range at the top of this page is chosen inside the spread these guides publish, converted to include 20% VAT where a guide states its prices exclude it. Where guides disagree, both figures stay visible above so you can judge for yourself.

1. What are you planning?
2. Finish level

Renovating outside the UK? These figures will not fit. France · Spain

Kitchen renovation, mid-range, London

£12,500 to £22,500

Including 20% VAT. An indication, not a quote: prices vary per trade and property.

Take it further

Nothing here is saved unless you ask. With a free account you can keep this estimate and come back to it later.

Prices include 20% VAT. New builds and some energy-saving works can qualify for 0% or reduced VAT; ask your installer.

On top of whatever you agree with a builder, set aside a contingency of 10 to 15% for the unforeseen: standard guidance for renovation work, with room to sit higher in an older property. How much contingency you need explains the guidance.

What drives the price

  • Cabinets and worktops: laminate to stone is the single biggest swing.
  • Appliances: keeping yours saves thousands; integrated sets add them.
  • Layout changes: moving the sink or cooker adds plumbing and electrics.
  • Walls and floors: replastering and tiling grow with the room.

All figures come from the same validated 2026 price data as the calculator above, built on the sources listed higher up on this page, each opened and checked on 26 August 2026 (see how we price), so this page and your estimate can never disagree. Outside London? See the national guide, or compare every region in the regional overview. How to pay for it (remortgage, loan or savings) is its own guide: paying for a renovation. Planning an extension or loft? Check permitted development first.

Frequently asked questions

Is it cheaper to keep the kitchen layout?

Much cheaper. Keeping the sink, cooker and appliances where they are avoids new plumbing runs, gas or circuit work and floor repairs; most of a budget renovation is exactly that discipline.

What should I do first?

Three steps, in this order. First, turn the guide range above into your own number: the calculator on this page adjusts for size, finish level and region in under a minute, free and without email. Second, if the layout matters, bathrooms and kitchens especially, draw the room to scale in the free planner; moving plumbing is usually the biggest hidden cost, and you want to know that before anyone quotes. Third, get at least three itemised quotes and compare them line by line against your range before you commit; the quote check on this site gives you an honest verdict per quote.

Do these prices include VAT?

Yes, all ranges include 20% VAT. New builds and some energy-saving works can qualify for 0% or reduced VAT; ask your installer whether your project applies.

Why is London so much more expensive?

Labour is the driver: London trades charge roughly 25% above the national average, and parking, access and waste logistics add friction. Nationally this project runs £10,000 to £18,000; the calculator switches region in one click.

How accurate is this range?

It is a guide range from national 2026 cost guides, adjusted for finish level and region. Real quotes vary per trade, property and specification; treat it as a starting point, budget 10 to 15 percent contingency, and always get at least three itemised quotes.